Oil Carryover and how to remove the same
An oil-injected screw compressor carries some oil downstream in the form of liquid, aerosol, and vapour. This requires careful planning […]
An oil-injected screw compressor carries some oil downstream in the form of liquid, aerosol, and vapour. This requires careful planning […]
In the world of compressed air and gas treatment, adsorption dryers play a critical role in ensuring dry, moisture-free air
Compression in a screw compressor is achieved by intermeshing of male and female rotors. The male rotor has four lobes
What is ASME U-Stamp certification? The ASME U-Stamp is a globally recognized certification issued by the American Society of Mechanical
Another Non-Ferrous Shell & Tube HE delivered from Gas Processing Equipment Pvt. Ltd. Shell is Carbon Steel, Tubes are Admiralty
A leading #Refinery is executing a major expansion project. To augment their #InstrumentAir supply, they required an #AirDryer package. GPE
GPE has successfully executed the contract for engineering, procurement, manufacturing and supply of a Kerosene Distillation Plant for a GCC based end user. We worked closely with our customer and process designer KLM Technology Group from Houston to modularize this complex multilevel distillation plant in record time.
GPE has been supplying TEMA R and C class, removable and fixed type heat exchangers to various industries such as Oil & Gas, Refineries, Petrochemicals, Fertilizers, Steel, Defense, Renewable Energy etc. since its inception.
GPE has developed a fully customized ERP system based on the SAP B1 platform. It has been named GPEPRO which is an acronym for Gas Processing Equipment – Process and Resource Optimization. GPEPRO was rolled out across Marketing, Project Management, Engineering, Procurement
Setting up a process plant is a complex task and delays are inevitable. This means that commissioning activities always end up being on the critical path. With massive investments already made and product delivery contracts in place, end users are hardly amused if a particular sub-system develops a snag during commissioning